Home / Product Line / Yoghurt Production Line
Yoghurt Production Line
Yoghurt Production Line

街机电玩城水浒传下载5803阅读

街机电玩城 下载苹果版

Contact Us

金雅街机电玩游戏下载

32 1

13

24

街机电玩城-疯狂斗地主手机版下载

The pretreatment of the milk is the same, regardless of whether set or stirred yoghurt is to be produced. It includes standardization of the fat and dry matter contents, heat treatment and homogenization. It is assumed that the milk has been standardized to the required fat content before entering the line and standardization of the dry matter content takes place in an evaporator in the process line. If the dry matter content is adjusted by addition of milk powder, the equipment used is similar to that described under “Recombined milk”. Any additives, such as stabilizers, vitamins, etc., can be metered into the milk before the heat treatment. When the yoghurt milk has been pretreated and cooled to inoculation temperature, the procedure for further treatment depends on whether set, stirred, drink, frozen or concentrated yoghurt is to be produced.

街机电玩城龙鲨争霸游戏下载

Figure 11.11 shows the Production of stirred yogurt. The pretreated milk, cooled to incubation temperature, is pumped to the incubation tanks (7).

Simultaneously a preset volume of bulk starter (6) is dosed into the milk stream. After a tank has been filled, agitation commences and continues for a short time to assure uniform distribution of the starter culture. The incubation tanks are insulated to ensure that the temperature remains constant during the incubation period. The tanks can be fitted with pH meters to check the development of acidity.

In typical production of stirred yoghurt the incubation period is 2.5 to 3hours at 42 – 43C when the ordinary type of bulk starter (2.5 – 3% inoculums) is utilised. To attain optimum quality, cooling from 42 – 43C to15 – 22C should be accomplished within 30 minutes after the ideal pH-value has been reached to stop further development of bacteria. The coagulum must be subjected to gentle mechanical treatment so that the final product will have the correct consistency. Cooling takes place in a plate heat exchanger (8) with special plate. After cooling to 15 – 22C, the yoghurt is ready for packing.

Fruit and various flavours can be added (10) to the yoghurt when it is transferred from the buffer tanks to the filling machines. This is done continuously with a variable speed metering pump which feeds the ingredients into the yoghurt in the fruit blending unit. The blending unit is static and hygienically designed to guarantee that the fruit is thoroughly mixed into the yoghurt.

The fruit metering pump and the yoghurt feed pump operate synchronously.

Yoghurt Production Line1

Yoghurt Production Line2

街机电玩城套牛达人下载

1. Water Treatment section
2. Milk Receiving or Powder Dissolving Section
3. Preparation Section
4. Sterilization Section
5. Fermentation Section
6. Filling & Packaging Section
7. CIP Cleaning Section
8. Chiller
9. Compressor
10. Steam Boiler
11. Cooling or Incubation Room
12. Installation Material

2014街机电玩城手机版下载安装

现在的街机手机电玩城怎样下载的 Fresh cow milk , powder milk
街机电玩城鱼丸游戏下载 Stirred yoghurt, Set yoghurt, Drinking yoghurt,etc
街机电玩城疯狂斗地主免费版下载安装 2T/D–500T/D
街机电玩下分版苹果版下载安装 Gabletop carton,plastic bottle,plastic cup,glass bottle,etc

街机电玩现金捕鱼游戏下载